Auro Panorama construction status is in its pre-launch stage across a 9-acre land parcel in Kondapur, where ground soil testing and boundary fencing are moving ahead of the December 2030 possession date. Auro Realty is building this project right opposite National Highway 65 near Hafeezpet Flyover with 4 high-rise towers that rise 35 floors high (G+35) and hold 1,500 homes.

The master plan keeps 70% of the area open for green parks, walking tracks, and fresh air. Buyers can choose between 2, 3, and 4 BHK flats sized from 1,400 sq. ft. to 2,200 sq. ft. Prices start at ₹2.2 crore for a 2 BHK home, and the builder will share the full price list at the official launch on 20 December 2026. Official RERA approval is awaited right now, and deep ground digging along with pillar work will start after all government papers are cleared.

Current Pre-Launch Ground Status and Site Preparation


Auro Panorama site work is currently focused on marking plot lines and testing the soil across the entire 9-acre property. Teams of site workers and land surveyors are setting up ground points so heavy diggers can start work without delays.

  • Boundary Walls: Strong metal sheets and brick borders stand all along NH 65 to keep the work area safe and closed off.
  • Soil Testing: Drilling machines are boring deep holes across the ground to check rock strength for the heavy G+35 towers.
  • Land Clearing: Big bulldozers are clearing wild bushes and leveling high dirt piles to make the surface flat and clean.
  • Truck Pathways: Wide gravel roads are laid out inside the gate so heavy cement trucks can drive in and out easily.
  • Site Cabins: Temporary offices, worker rest rooms, and iron storage sheds are already set up near the main gate.

Structural Footprint and G+35 Tower Engineering Breakdown


The project plan lays out 4 tall apartment towers that go up from the ground to 35 upper floors using strong steel and concrete frames. Civil engineers have designed deep pillar footings that will rest right on solid underground rock to keep these tall buildings safe and stable.

Project Detail Planned Size Current Work at Site
Total Towers 4 High-Rise Blocks Land borders marked; tower spots mapped on the ground
Tower Height Ground + 35 Floors (G+35) Foundation checks and pillar load plans being checked
Total Homes 1,500 Flats Flat sizes planned and floor blueprints ready
Total Land 9 Acres (70% Open Space) Ground cleaned up and boundary work finished
Building Frame Strong Earthquake-Safe RCC Frame Deep soil core tests going on right now

Key Milestone Schedules from Pre-Launch to Possession


Civil work follows a clear step-by-step plan that leads up to the final keys handover in December 2030. The builder started pre-launch work in October 2026 and plans to open the project for booking on 20 December 2026.

  • October 2026: Pre-launch starts, ground checks take place, and early government papers are sent for review.
  • 20 December 2026: Official public launch takes place, and final building dates are shared with buyers.
  • 2027 to 2028: Deep basement digging, thick concrete base slabs, and lower tower floor casting will take shape.
  • 2029 to Mid 2030: Roof slabs on all 4 towers will finish, followed by wall brickwork, painting, and pipe fittings.
  • 28 December 2030: The full project reaches completion, and families start getting possession of their homes.

Regulatory Clearances and RERA Construction Compliance


Auro Panorama's RERA number is awaited right now, as the plan drawings and safety papers sit with the state property board for sign-off. The builder must follow all city municipal laws and green norms before starting full-scale cement work.

Once the RERA certificate comes through, buyers can check official progress photos and spending details online every three months. Money paid by buyers will sit in a safe bank account and go out only as each floor gets built. Local fire safety, city height checks, and rain drain rules are all built directly into the site plan.

Post-Launch Civil Works and Substructure Development Roadmap


Deep basement digging and ground piling are planned to start right after the official launch in December 2026. Tall piling rigs will arrive at the site to drill deep holes and fill them with thick steel rods and ready-mix concrete for the 4 towers.

After the digging ends, workers will pour thick foundation slabs and build strong basement walls to keep out groundwater. Then the towers will go up fast using smooth aluminium shuttering molds that let teams pour one floor after another on a set schedule. Plumbers and electricians will work three floors below the slab teams to keep everything on track for the December 2030 delivery date.

FAQs


1. What is the current construction status of Auro Panorama?

Auro Panorama is in its pre-launch stage, with soil drilling, land leveling, and boundary fence work going on across the 9-acre plot. Main foundation digging and pillar work will start after the official launch on 20 December 2026.

2. When will buyers get possession of their flats in Auro Panorama?

The builder has set the final project completion date for 28 December 2030, with home handovers planned to happen through December 2030.

3. How many towers will be built at Auro Panorama?

The project features 4 high-rise towers that stand 35 floors high (G+35) and hold 1,500 luxury flats.

4. Is Auro Panorama approved by Telangana RERA?

RERA approval is awaited right now. The builder will share the official RERA registration number and audited work reports once the government office issues the papers.

5. When will floor slab casting start for the towers?

Floor slab work will begin after basement digging and thick raft foundation slabs are finished, which is set to move forward steadily through 2027.